Estimate with uncertainty, the PMP way: optimistic, most likely and pessimistic durations per activity give the PERT expected time, standard deviation and variance – with total path duration and the duration you can promise at about 68%, 95% and 99.7% confidence.
- Automatic summary: Path expected duration (days), Path standard deviation, ~68% confident (±1σ), ~95% confident (±2σ), ~99.7% confident (±3σ)
- Calculated for you: Expected (Te), Std dev, Variance, Triangular estimate
- Example rows and a step-by-step "How to Use" sheet