Pre-Commissioning Checklist for Split, Ducted and VRF Air Conditioning Systems – Word Template


Price:
Sale priceDhs. 5.00

Description

Check every AC system before start-up: installation and clearances, refrigerant piping and pressure test, vacuum and charge, drainage, electrical supply and protection, controls and addressing – with readings at start-up.

  • Installation, piping and drainage checks
  • Electrical, controls and addressing
  • Start-up readings and sign-off

Instant download (.docx). Works in Microsoft Word 2010+, Word for the web, Google Docs, Apple Pages and LibreOffice. A4 page size, ready to print – or fill in on screen. Placeholders are shown in [brackets] and colour, so you can see exactly what to replace.

Payment & Security

Apple Pay Google Pay Maestro Mastercard PayPal Shop Pay Visa

Your payment information is processed securely. We do not store credit card details nor have access to your credit card information.

You may also like

Recently viewed